I think when I bought this house, I thought I could get projects done quickly by focusing on one room at a time. I've mostly followed the one room at a time thing, except work that I had to do for renting out my second floor apartment and some yard work. Last night I sat down and started putting together a list of things that need to be done to finish the East Room. 

Now that I'm finished, it feels a little daunting. I may have to get more help on this than I had planned. Not so much that I can't do it, but because I'm living in about 550 square feet and I'm feeling pretty cramped. Also, I'm trying to have something of a life. Anyway, here it is. It should read more like a dependent schedule than an outline.

  • Attach Subfloor
    • Initial Mason Repair
    • Rebuild cellar entrance to allow full access to North windows that are currently non-existent (one is actually a boarded-up door).
    • Perimeter wall framing
      • Install new North windows & frames and repair masonry around windows
      • Install new exterior door & frame and repair masonry around door
      • Install new spigot (old one is too low)
      • Install new electrical
        • Install perimeter wall insulation
          • Finish walls
            • Install ceiling insulation
              • Finish ceiling
                • Install floor