I think when I bought this house, I thought I could get projects done quickly by focusing on one room at a time. I've mostly followed the one room at a time thing, except work that I had to do for renting out my second floor apartment and some yard work. Last night I sat down and started putting together a list of things that need to be done to finish the East Room.
Now that I'm finished, it feels a little daunting. I may have to get more help on this than I had planned. Not so much that I can't do it, but because I'm living in about 550 square feet and I'm feeling pretty cramped. Also, I'm trying to have something of a life. Anyway, here it is. It should read more like a dependent schedule than an outline.
- Attach Subfloor
- Initial Mason Repair
- Rebuild cellar entrance to allow full access to North windows that are currently non-existent (one is actually a boarded-up door).
- Perimeter wall framing
- Install new North windows & frames and repair masonry around windows
- Install new exterior door & frame and repair masonry around door
- Install new spigot (old one is too low)
- Install new electrical
- Install perimeter wall insulation
- Finish walls
- Install ceiling insulation
- Finish ceiling
- Install floor